Separate energy and power needs
Compare usable battery energy, supported circuit demand and the intended operating mode before choosing storage.
For a California home, distinguish an existing solar retrofit from a new solar-and-storage project. Review the current utility agreement before changing equipment or assuming export compensation stays the same.
Explore My Energy OptionsAI-generated illustration. Not an actual Green Synergy installation.Compare usable battery energy, supported circuit demand and the intended operating mode before choosing storage.
Bring the utility bill and any separate supply agreement. Check the tariff and import/export terms for this address before comparing costs.
Identify essential circuits and equipment demand. Outage operation requires compatible equipment and configuration; duration depends on usable capacity and load.
Equipment, permits, interconnection and installation responsibilities are reviewed for the property. Coverage does not guarantee that every site or proposed system is suitable.
Bring the interconnection date, current bill, equipment details and any existing agreement. Check the effect of a proposed change before accepting a retrofit design.
Some systems can, with compatible backup equipment, transfer controls, and an appropriate installation. Not every battery installation includes outage operation.
No. Financial results require property-specific modeling and verified current terms. Any financing, incentive or program must be confirmed separately; no benefit is assumed.
A few short questions. A conversation about what is possible for your property.