Read the complete agreement
Compare supply, delivery, imports, exports and contract conditions together; a single advertised rate is not the whole comparison.
For a New Jersey property, review annual electricity use, roof suitability and the actual equipment proposal. If a quote includes production-related benefits or credits, confirm eligibility, ownership and assignment in writing.
Explore My Energy OptionsAI-generated illustration. Not an actual Green Synergy installation.Compare supply, delivery, imports, exports and contract conditions together; a single advertised rate is not the whole comparison.
Bring the utility bill and any separate supply agreement. Check the tariff and import/export terms for this address before comparing costs.
Identify essential circuits and equipment demand. Outage operation requires compatible equipment and configuration; duration depends on usable capacity and load.
Equipment, permits, interconnection and installation responsibilities are reviewed for the property. Coverage does not guarantee that every site or proposed system is suitable.
It depends on the verified program and agreement. Do not assume the homeowner keeps a benefit if a contract assigns it elsewhere.
Some systems can, with compatible backup equipment, transfer controls, and an appropriate installation. Not every battery installation includes outage operation.
No. Financial results require property-specific modeling and verified current terms. Any financing, incentive or program must be confirmed separately; no benefit is assumed.
A few short questions. A conversation about what is possible for your property.